Forecast Lead Time in Months | grid: /L (months) ordered [ (2.5)] :grid
|
S (forecast_reference_time) | grid: /S (days since 1960-01-01) ordered [ (0000 1 Apr 2022) (0000 1 May 2022) (0000 1 Jun 2022) (0000 1 Jul 2022) (0000 1 Aug 2022) (0000 1 Sep 2022) (0000 1 Oct 2022) (0000 1 Nov 2022) (0000 1 Dec 2022) (0000 1 Jan 2023) (0000 1 Feb 2023) (0000 1 Mar 2023) (0000 1 Apr 2023) (0000 1 May 2023) (0000 1 Jun 2023)] :grid
|
Longitud (longitude) | grid: /X (degree_east) ordered (119.9W) to (70W) by 0.1 N= 500 pts :grid
|
Latitud (latitude) | grid: /Y (degree_north) ordered (39.95N) to (4.95S) by 0.1 N= 450 pts :grid
|