NextGen CPT 1p0 Guatemala GFDL-CM2p5-FLOR-A06 Forecast target_date: forecast time data
forecast time from NextGen CPT 1p0 Guatemala GFDL-CM2p5-FLOR-A06 Forecast: Forecast and Error.
Independent Variables (Grids)
- Forecast Lead Time in Months
- grid: /L (months) ordered [ (2.5)] :grid
- Hecho en (forecast_reference_time)
- grid: /S (months since 1960-01-01) ordered (0000 1 Jan 2019) to (0000 1 Jan 2021) by 1.0 N= 25 pts :grid
Other Info
- calendar
- 360
- CE
- null
- CS
- null
- datatype
- realarraytype
- gridid
- 181368432
- pointwidth
- 3
- scale_max
- null
- scale_min
- null
- standard_name
- forecast_reference_time
- units
- months since 1960-01-01
- standard units*
- 0.0833333333333333 ( years since 1960-01-01 00:00.000000000 )
Last updated: Wed, 06 Jan 2021 16:05:25 GMT
Expires: Sat, 09 May 2020 00:00:00 GMT
Filters
Here are some filters that are useful for manipulating data. There
are actually many more available, but they have to be entered
manually. See
Ingrid
Function Documentation for more information.
- Monthly Climatology calculates
a monthly climatology by averaging over all years.
- anomalies calculates the difference
between the (above) monthly climatology and the original data.
- Integrate along S
- Differentiate along S
- Take differences along S
Average over
S
|
RMS (root mean square with mean *not* removed) over
S
|
RMSA (root mean square with mean removed) over
S
|
Maximum over
S
|
Minimum over
S
|
Detrend (best-fit-line) over
S
|
Note on units