served from 45.183.221.150

NextGen CPT 1p0 Guatemala GFDL-CM2p5-FLOR-A06 Forecast Length of forecast time

Length of forecast time from NextGen CPT 1p0 Guatemala GFDL-CM2p5-FLOR-A06 Forecast: Forecast and Error.

Documents

overviewan outline showing sub-datasets of this dataset

Independent Variables (Grids)

Forecast Lead Time in Months grid: /L (months) ordered [ (2.5)] :grid
Hecho en (forecast_reference_time) grid: /S (months since 1960-01-01) ordered (0000 1 Jan 2019) to (0000 1 Jan 2021) by 1.0 N= 25 pts :grid

Other Info

CE
null
CS
null
missing_value
NaN
pointwidth
1.0
standard units
86400 second
history
Averaged in T with overlapping interval 3

Last updated: Fri, 10 Apr 2020 20:38:32 GMT

Data Views

LSXY
NextGen CPT 1p0 Guatemala GFDL-CM2p5-FLOR-A06 Forecast[ ]
grid: /X (degree_east) ordered (94W) to (87W) by 1.0 N= 8 pts :gridM
grid: /Y (degree_north) ordered (12N) to (19N) by 1.0 N= 8 pts :gridM
grid: /S (months since 1960-01-01) ordered (0000 1 Jan 2019) to (0000 1 Jan 2021) by 1.0 N= 25 pts :gridM
[ X Y | S L]MMMM
[ S L |]MM