NextGen CPT Estacional CHIRPS Guatemala NextGenL2 Forecast target_date: forecast time data
forecast time from NextGen CPT Estacional CHIRPS Guatemala NextGenL2 Forecast: Forecast and Error.
Independent Variables (Grids)
- Forecast Lead Time in Months
- grid: /L (months) ordered [ (3.5)] :grid
- Hecho en (forecast_reference_time)
- grid: /S (months since 1960-01-01) ordered (0000 1 Mar 2023) to (0000 1 Nov 2024) by 1.0 N= 21 pts :grid
Other Info
- calendar
- 360
- CE
- null
- CS
- null
- datatype
- realarraytype
- gridid
- 172819536
- pointwidth
- 3
- scale_max
- null
- scale_min
- null
- standard_name
- forecast_reference_time
- units
- months since 1960-01-01
- standard units*
- 0.0833333333333333 ( years since 1960-01-01 00:00.000000000 )
Last updated: Thu, 23 Mar 2023 19:50:42 GMT
Expires: Sun, 09 Apr 2023 00:00:00 GMT
Filters
Here are some filters that are useful for manipulating data. There
are actually many more available, but they have to be entered
manually. See
Ingrid
Function Documentation for more information.
- Monthly Climatology calculates
a monthly climatology by averaging over all years.
- anomalies calculates the difference
between the (above) monthly climatology and the original data.
- Integrate along S
- Differentiate along S
- Take differences along S
Average over
S
|
RMS (root mean square with mean *not* removed) over
S
|
RMSA (root mean square with mean removed) over
S
|
Maximum over
S
|
Minimum over
S
|
Detrend (best-fit-line) over
S
|
Note on units